---
schema_version: "secwatch.filing_event.v1"
accession: "0000072903-24-000209"
form_type: "8-K"
ticker: "XEL"
cik: "0000072903"
company_name: "XCEL ENERGY INC"
filed_at: "2024-12-31T23:59:59+00:00"
generated_at: "2026-05-28T22:34:09.777860+00:00"
event_type: "regulatory"
sentiment: "neutral"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# SPS files $538M Texas System Resiliency Plan with PUCT for 2025-2028

## Summary
- Southwestern Public Service Company filed its Texas System Resiliency Plan with the PUCT on Dec 30, 2024.
- Plan covers 2025-2028 with $521M capital and $17M O&M, totaling $538M.
- Key measures: distribution hardening ($253M), system protection ($92M), communications ($112M), operational flexibility ($44M), wildfire mitigation ($37M).
- PUCT decision expected in Q2 2025; procedural schedule in Q1 2025.

## SEC filing metadata
- accession: 0000072903-24-000209
- form_type: 8-K
- ticker: XEL
- cik: 0000072903
- company_name: XCEL ENERGY INC
- filed_at: 2024-12-31T23:59:59+00:00
- event_type: regulatory
- sentiment: neutral
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/72903/000007290324000209/0000072903-24-000209-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/72903/000007290324000209/xel-20241230.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000072903-24-000209
- JSON: https://secwatch.observer/filing/0000072903-24-000209.json
- Plain text: https://secwatch.observer/filing/0000072903-24-000209.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
