---
schema_version: "secwatch.filing_event.v1"
accession: "0000072903-26-000101"
form_type: "8-K"
ticker: null
cik: "0000081018"
company_name: "PUBLIC SERVICE CO OF COLORADO"
filed_at: "2026-06-03T00:41:37+00:00"
generated_at: "2026-06-03T10:05:38.876098+00:00"
event_type: "regulatory"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# PSCo files non-unanimous settlement in Colorado rate case; seeks $225M revenue increase (6.3%)

## Summary
- Settlement filed June 2, 2026, with CPUC; revenue increase of $225M (6.3%) vs. original request of $356M (9.9%).
- ROE set at 9.3%, equity ratio at 54.5%; original request was 9.8% ROE and 55% equity.
- Opponents include AARP, City of Boulder; hearings scheduled for June 2026, decision expected Q3 2026.
- Xcel Energy reaffirms 2026 ongoing EPS guidance of $4.04 to $4.16.
- Settlement includes a performance framework for Comanche Unit 3 coal facility through 2029.

## SEC filing metadata
- accession: 0000072903-26-000101
- form_type: 8-K
- cik: 0000081018
- company_name: PUBLIC SERVICE CO OF COLORADO
- filed_at: 2026-06-03T00:41:37+00:00
- event_type: regulatory
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/81018/000007290326000101/0000072903-26-000101-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/72903/000007290326000101/xel-20260602.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000072903-26-000101
- JSON: https://secwatch.observer/filing/0000072903-26-000101.json
- Plain text: https://secwatch.observer/filing/0000072903-26-000101.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
