other_material
confidence high
sentiment positive
materiality 0.75
Mount Milligan PFS confirms ~10-year mine-life extension to 2045; reserves up 56%
ROYAL GOLD INC
- Centerra's PFS extends Mount Milligan LOM to 2045; throughput to rise 10% to ~66,300 tpd in 2029.
- Proven & probable reserves: 4.4M oz gold (+56% vs 2024) and 1.7B lb copper (+52%).
- Average annual production 2026-2042: ~150K oz gold, ~69M lb copper.
- Permitting for extension through 2035 submitted; second tailings facility planned for early 2030s.
- Royal Gold recovered >150% of advance stream deposit; PFS adds long-term value for stakeholders.
item 7.01item 9.01