---
schema_version: "secwatch.filing_event.v1"
accession: "0000106640-26-000052"
form_type: "8-K"
ticker: "WHR"
cik: "0000106640"
company_name: "WHIRLPOOL CORP /DE/"
filed_at: "2026-07-01T21:05:25+00:00"
generated_at: "2026-07-01T21:06:09.057737+00:00"
event_type: "other_material"
sentiment: "negative"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# Whirlpool to close Supsa Mexico facility by Q2 2027; expects ~$165M restructuring costs

## Summary
- Closure of Supsa manufacturing facility in Apodaca, Mexico by Q2 2027; production transferred to Ramos Arizpe and other network.
- Total estimated restructuring costs of $165M: $95M asset impairment, $30M employee-related, $40M other.
- Approximately $70M of total costs are future cash expenditures; ~$15M cash spend expected in 2026.
- Substantial completion expected in 2027; ~$100M of total costs to be incurred in 2026.

## SEC filing metadata
- accession: 0000106640-26-000052
- form_type: 8-K
- ticker: WHR
- cik: 0000106640
- company_name: WHIRLPOOL CORP /DE/
- filed_at: 2026-07-01T21:05:25+00:00
- event_type: other_material
- sentiment: negative
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 2.05
- EDGAR index: https://www.sec.gov/Archives/edgar/data/106640/000010664026000052/0000106640-26-000052-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/106640/000010664026000052/whr-20260701.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000106640-26-000052
- JSON: https://secwatch.observer/filing/0000106640-26-000052.json
- Plain text: https://secwatch.observer/filing/0000106640-26-000052.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
