{"schema_version":"secwatch.filing_event.v1","accession":"0000215466-24-000072","form_type":"8-K","ticker":"CDE","cik":"0000215466","company_name":"Coeur Mining, Inc.","filed_at":"2024-04-08T23:59:59+00:00","discovered_at":"2026-05-14T18:03:21.464272+00:00","generated_at":"2026-06-04T01:35:39.847305+00:00","sec_items":["8.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Coeur Mining's expanded Rochester mine achieves commercial production; ramp-up on track for H1 2024","bullets":["Crushing circuit averaged nearly 70,000 tpd post-commissioning, exceeding 88,000 tpd at times.","Full design capacity of 88,000 tpd (32M tons/year) remains on schedule for first half 2024.","Approximately 9.3M tons of ore placed on new Stage 6 leach pad commissioned late 2023.","Once at full capacity, throughput expected ~2.5x historical levels, making Rochester a top global heap leach mine.","Mine projected to be America's largest domestic source of refined silver, driving cash flow growth."],"urls":{"canonical":"https://secwatch.observer/filing/0000215466-24-000072","json":"https://secwatch.observer/filing/0000215466-24-000072.json","markdown":"https://secwatch.observer/filing/0000215466-24-000072.md","text":"https://secwatch.observer/filing/0000215466-24-000072.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/215466/000021546624000072/0000215466-24-000072-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/215466/000021546624000072/cde-20240408.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-04T01:35:39.847305+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}