---
schema_version: "secwatch.filing_event.v1"
accession: "0000784977-25-000096"
form_type: "8-K"
ticker: "POR"
cik: "0000784977"
company_name: "PORTLAND GENERAL ELECTRIC CO /OR/"
filed_at: "2025-05-30T23:59:59+00:00"
generated_at: "2026-05-20T05:14:04.184243+00:00"
event_type: "regulatory"
sentiment: "neutral"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# PGE files with OPUC to recover $47M revenue requirement for 200 MW Seaside battery storage

## Summary
- Filed under OPUC Docket UE 455 for expedited cost-recovery of Seaside Battery Storage.
- Requests annualized revenue requirement increase of $47M and rate base increase of $257M, net of $117M ITC.
- Cost of capital based on OPUC-approved 9.34% ROE from 2025 General Rate Case (UE 435).
- Seaside is a 200 MW facility in Portland, OR, expected commercial operation before Aug 21, 2025.
- PGE seeks inclusion in customer prices by Oct 31, 2025; outcome of regulatory review uncertain.

## SEC filing metadata
- accession: 0000784977-25-000096
- form_type: 8-K
- ticker: POR
- cik: 0000784977
- company_name: PORTLAND GENERAL ELECTRIC CO /OR/
- filed_at: 2025-05-30T23:59:59+00:00
- event_type: regulatory
- sentiment: neutral
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/784977/000078497725000096/0000784977-25-000096-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/784977/000078497725000096/por-20250530.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000784977-25-000096
- JSON: https://secwatch.observer/filing/0000784977-25-000096.json
- Plain text: https://secwatch.observer/filing/0000784977-25-000096.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
