---
schema_version: "secwatch.filing_event.v1"
accession: "0000784977-25-000110"
form_type: "8-K"
ticker: "POR"
cik: "0000784977"
company_name: "PORTLAND GENERAL ELECTRIC CO /OR/"
filed_at: "2025-06-18T23:59:59+00:00"
generated_at: "2026-05-19T03:54:01.850628+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.6
calibrated_materiality_score: 0.6
confidence: "high"
source: SEC EDGAR
---

# POR updates CEP/IRP; raises renewable capacity need to 4,000 MW midpoint

## Summary
- New Preferred Portfolio; renewable/non-emitting capacity need raised from 3,200 MW to 4,000 MW midpoint (range 3,500–4,500 MW).
- No changes to previously acknowledged 2023 CEP/IRP Action Plan; 2025 All-Source RFP still supports procurement.
- Hybrid solar+battery capacity now reported by individual technology, causing stated need increase.
- OPUC regulatory review (Docket LC 80) to occur over coming months; ultimate outcome uncertain.

## SEC filing metadata
- accession: 0000784977-25-000110
- form_type: 8-K
- ticker: POR
- cik: 0000784977
- company_name: PORTLAND GENERAL ELECTRIC CO /OR/
- filed_at: 2025-06-18T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.6
- calibrated_materiality_score: 0.6
- confidence: high
- sec_items: 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/784977/000078497725000110/0000784977-25-000110-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/784977/000078497725000110/por-20250618.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000784977-25-000110
- JSON: https://secwatch.observer/filing/0000784977-25-000110.json
- Plain text: https://secwatch.observer/filing/0000784977-25-000110.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
