---
schema_version: "secwatch.filing_event.v1"
accession: "0000784977-25-000161"
form_type: "8-K"
ticker: "POR"
cik: "0000784977"
company_name: "PORTLAND GENERAL ELECTRIC CO /OR/"
filed_at: "2025-10-02T23:59:59+00:00"
generated_at: "2026-05-17T04:59:33.956013+00:00"
event_type: "regulatory"
sentiment: "neutral"
materiality_score: 0.5
calibrated_materiality_score: 0.5
confidence: "high"
source: SEC EDGAR
---

# PGE files updated final shortlist for 2023 All-Source RFP with OPUC, projects 1.0 GW capacity

## Summary
- Updated shortlist includes three projects: 250 MW solar+battery, 365 MW solar+battery hybrid, 400 MW battery (company-owned portions: 250, 175, 400 MW).
- Refresh triggered by July 4, 2025 passage of House Resolution 1 (One Big Beautiful Bill Act) and trade tariff impacts; bids re-evaluated with independent evaluator.
- OPUC acknowledgement sought by Nov 25, 2025; contract finalization expected by end of 2025, projects in service by end of 2027.
- PGE also pursuing renewable PPAs through bilateral all-call, community-based procurement, and ongoing 2025 RFP.

## SEC filing metadata
- accession: 0000784977-25-000161
- form_type: 8-K
- ticker: POR
- cik: 0000784977
- company_name: PORTLAND GENERAL ELECTRIC CO /OR/
- filed_at: 2025-10-02T23:59:59+00:00
- event_type: regulatory
- sentiment: neutral
- materiality_score: 0.5
- calibrated_materiality_score: 0.5
- confidence: high
- sec_items: 7.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/784977/000078497725000161/0000784977-25-000161-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/784977/000078497725000161/por-20251001.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000784977-25-000161
- JSON: https://secwatch.observer/filing/0000784977-25-000161.json
- Plain text: https://secwatch.observer/filing/0000784977-25-000161.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
