{"schema_version":"secwatch.filing_event.v1","accession":"0000831259-25-000052","form_type":"8-K","ticker":"FCX","cik":"0000831259","company_name":"FREEPORT-MCMORAN INC","filed_at":"2025-11-18T23:59:59+00:00","discovered_at":"2026-05-14T18:02:42.294714+00:00","generated_at":"2026-05-16T18:59:18.059772+00:00","sec_items":["7.01","8.01","9.01"],"event_type":"other_material","sentiment":"negative","materiality_score":0.85,"confidence":"high","headline":"Freeport: Grasberg Block Cave restart begins Q2 2026; 2026 production ~1B lbs Cu, 0.9M oz Au","bullets":["Phased restart of Grasberg Block Cave underground mine begins in Q2 2026; remediation underway.","2026 PTFI production forecast similar to 2025: ~1.0B lbs copper and 0.9M oz gold.","2027-2029 average annual production expected to reach 1.6B lbs copper and 1.3M oz gold.","September 2025 mud rush incident caused 7 fatalities; operations suspended and force majeure declared.","Unaffected Big Gossan and Deep Mill Level Zone mines restarted in late October 2025."],"urls":{"canonical":"https://secwatch.observer/filing/0000831259-25-000052","json":"https://secwatch.observer/filing/0000831259-25-000052.json","markdown":"https://secwatch.observer/filing/0000831259-25-000052.md","text":"https://secwatch.observer/filing/0000831259-25-000052.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/831259/000083125925000052/0000831259-25-000052-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/831259/000083125925000052/fcx-20251118.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T18:59:18.059772+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}