secwatch.observer — SEC 8-K summary ====================================== Issuer: VAALCO ENERGY INC /DE/ (EGY) CIK: 0000894627 Form: 8-K Filed at: 2026-04-21T23:59:59+00:00 Accession: 0000894627-26-000020 Event type: other_material Sentiment: positive Materiality: 0.65 Item codes: 2.02, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Vaalco reports Etame 14H well flowed ~4,850 gross BOPD; Baobab restart on track for Q2 2026 -------------------------------------------------------------------------------- - Etame 14H development well achieved initial flow rate ~4,850 gross BOPD (2,850 net to Vaalco) with 325m net pay in Gamba sands. - Rig mobilized to Ebouri platform; drilling commenced on EEBOM-5H development well targeting attic position. - Baobab FPSO arrived in Côte d'Ivoire April 2 after refurbishment; full reconnection underway, restart expected Q2 2026. - CEO cites profitable remainder of 2026 driven by Gabon drilling success and Baobab production returning online. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/894627/000089462726000020/0000894627-26-000020-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/894627/000089462726000020/egy-20260421.htm HTML page: https://secwatch.observer/filing/0000894627-26-000020 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer