secwatch.observer — SEC 8-K summary ====================================== Issuer: VAALCO ENERGY INC /DE/ (EGY) CIK: 0000894627 Form: 8-K Filed at: 2026-10-07T10:58:37+00:00 Accession: 0000894627-26-000054 Event type: other_material Sentiment: positive Materiality: 0.50 Item codes: 2.02, 9.01 LLM model: deepseek-v4.1-flash:cloud@v2 Vaalco wraps Gabon Phase 3 as ETSEM-3H flows ~2,000 gross BOPD; Baobab Phase 5 drilling starts -------------------------------------------------------------------------------- - ETSEM-3H development well in an attic position within Gabon's SE Etame field placed on production; 300 meters of net pay in Gamba reservoir sands. - Stabilized initial flow rate of about 2,000 gross BOPD, or 1,140 BOPD net to Vaalco; Phase 3 drilling program now complete. - Borr Norve rig demobilized from the SE Etame platform after the final Phase 3 well. - Offshore Côte d'Ivoire, Baobab Phase 5 has begun with batch-setting of top-holes; plan calls for four producers, three water injectors and two workovers. - First new Baobab producer expected online near end of 2026, with meaningful production growth anticipated in 2027, per CEO George Maxwell. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/894627/000089462726000054/0000894627-26-000054-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/894627/000089462726000054/egy-20261007.htm HTML page: https://secwatch.observer/filing/0000894627-26-000054 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer