---
schema_version: "secwatch.filing_event.v1"
accession: "0000921638-24-000147"
form_type: "8-K"
ticker: "SSRM"
cik: "0000921638"
company_name: "SSR MINING INC."
filed_at: "2024-07-31T23:59:59+00:00"
generated_at: "2026-05-31T14:45:17.531384+00:00"
event_type: "earnings"
sentiment: "negative"
materiality_score: 0.8
calibrated_materiality_score: 0.8
confidence: "high"
source: SEC EDGAR
---

# SSR Mining posts Q2 gold output of 76k oz; Çöpler remediation cost estimate $250-300M

## Summary
- All nine missing colleagues from Feb 13 Çöpler incident have been recovered.
- Remediation cost estimate for Çöpler: $250-300 million; $55M spent in Q2.
- Q2 production: 76,102 gold eq oz; AISC $2,116/oz including $17.3M care and maintenance at Çöpler.
- Total cash $358M; available liquidity >$850M; full-year production guidance unchanged at 340k-380k oz.
- Sulfide stockpiles at Çöpler contain ~706k oz; restart timeline uncertain pending permits.

## SEC filing metadata
- accession: 0000921638-24-000147
- form_type: 8-K
- ticker: SSRM
- cik: 0000921638
- company_name: SSR MINING INC.
- filed_at: 2024-07-31T23:59:59+00:00
- event_type: earnings
- sentiment: negative
- materiality_score: 0.8
- calibrated_materiality_score: 0.8
- confidence: high
- sec_items: 2.02, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/921638/000092163824000147/0000921638-24-000147-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/921638/000092163824000147/ssrm-20240731.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000921638-24-000147
- JSON: https://secwatch.observer/filing/0000921638-24-000147.json
- Plain text: https://secwatch.observer/filing/0000921638-24-000147.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
