---
schema_version: "secwatch.filing_event.v1"
accession: "0000936340-26-000068"
form_type: "8-K"
ticker: null
cik: "0000028385"
company_name: "DTE Electric Co"
filed_at: "2026-03-17T23:59:59+00:00"
generated_at: "2026-05-15T11:09:09.578243+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# DTE Electric signs 20+ year power and clean energy agreements with Google for 1GW data center in MI

## Summary
- DTE Electric to provide electric service at standard industrial rate to Google's 1.0 GW data center in SE Michigan; term through Dec 2047 with extension options.
- Clean Capacity Accelerator Agreement: DTE Electric to deploy up to 480 MW storage and 1,600 MW renewables at Google's cost over 20-year term.
- Google will provide DTE Electric with ~300 MW of Zonal Resource Credits in MISO Zone 7 at no cost; parent Alphabet provides credit support.
- PSA includes minimum monthly charges and termination fees; CCAA extends upon mutual agreement.

## SEC filing metadata
- accession: 0000936340-26-000068
- form_type: 8-K
- cik: 0000028385
- company_name: DTE Electric Co
- filed_at: 2026-03-17T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 1.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/28385/000093634026000068/0000936340-26-000068-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/28385/000093634026000068/dte-20260316.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000936340-26-000068
- JSON: https://secwatch.observer/filing/0000936340-26-000068.json
- Plain text: https://secwatch.observer/filing/0000936340-26-000068.txt

## Key facts
- Material Agreements
  DTE Electric Co entered into Clean Capacity Accelerator Agreement with Google LLC valued at Deploy up to 480 MW energy storage and 1,600 MW renewable generation to support electric service, 20 (effective 2026-03-16).
  - Action: entry
  - Agreement: supply
  - Counterparty: Google LLC
  - Value: Deploy up to 480 MW energy storage and 1,600 MW renewable generation to support electric service, 20
  - Effective: 2026-03-16
  source text: On March 16, 2026, the Board of Directors of DTE Energy Company (“DTE Energy”) approved execution of a Primary Supply Agreement (“PSA”) and a Clean Capacity Accelerator Agreement (“CCAA”) between DTE Energy’s wholly-owned subsidiary DTE Electric Company (“DTE Electric”) and Google LLC (“Customer”) a wholly owned subsidiary of Alphabet Inc.
  evidence_url: https://www.sec.gov/Archives/edgar/data/28385/000093634026000068/0000936340-26-000068-index.htm
- Material Agreements
  DTE Electric Co entered into Primary Supply Agreement with Google LLC valued at Electric service at standard industrial rate for 1.0 GW data center, term through December 2047, min (effective 2026-03-16).
  - Action: entry
  - Agreement: supply
  - Counterparty: Google LLC
  - Value: Electric service at standard industrial rate for 1.0 GW data center, term through December 2047, min
  - Effective: 2026-03-16
  source text: On March 16, 2026, the Board of Directors of DTE Energy Company (“DTE Energy”) approved execution of a Primary Supply Agreement (“PSA”) and a Clean Capacity Accelerator Agreement (“CCAA”) between DTE Energy’s wholly-owned subsidiary DTE Electric Company (“DTE Electric”) and Google LLC (“Customer”) a wholly owned subsidiary of Alphabet Inc.
  evidence_url: https://www.sec.gov/Archives/edgar/data/28385/000093634026000068/0000936340-26-000068-index.htm

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
