{"schema_version":"secwatch.filing_event.v1","accession":"0000950170-24-075754","form_type":"8-K","ticker":"CLSK","cik":"0000827876","company_name":"CLEANSPARK, INC.","filed_at":"2024-06-20T23:59:59+00:00","discovered_at":"2026-05-14T18:03:22.096550+00:00","generated_at":"2026-06-01T03:47:14.410245+00:00","sec_items":["1.01","9.01"],"event_type":"m_and_a","sentiment":"positive","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"CleanSpark acquires 5 Georgia bitcoin mining sites for $25.8M, adding 60 MW capacity","bullets":["Five facilities totaling 60 MW purchased for $25.8M cash; closing immediate.","Expected to lift operating hashrate to over 20 EH/s by end of June using existing hardware.","Acquired sites anticipated to contribute >3.7 EH/s with S21 Pro miners installed.","Company will operate over 400 MW in Georgia after Sandersville fully energized.","Sites include interruptible PPAs enabling load balancing for local electric cooperatives."],"urls":{"canonical":"https://secwatch.observer/filing/0000950170-24-075754","json":"https://secwatch.observer/filing/0000950170-24-075754.json","markdown":"https://secwatch.observer/filing/0000950170-24-075754.md","text":"https://secwatch.observer/filing/0000950170-24-075754.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/827876/000095017024075754/0000950170-24-075754-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/827876/000095017024075754/clsk-20240617.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-01T03:47:14.410245+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}