---
schema_version: "secwatch.filing_event.v1"
accession: "0000950170-24-075754"
form_type: "8-K"
ticker: "CLSK"
cik: "0000827876"
company_name: "CLEANSPARK, INC."
filed_at: "2024-06-20T23:59:59+00:00"
generated_at: "2026-06-01T03:47:14.410245+00:00"
event_type: "m_and_a"
sentiment: "positive"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "high"
source: SEC EDGAR
---

# CleanSpark acquires 5 Georgia bitcoin mining sites for $25.8M, adding 60 MW capacity

## Summary
- Five facilities totaling 60 MW purchased for $25.8M cash; closing immediate.
- Expected to lift operating hashrate to over 20 EH/s by end of June using existing hardware.
- Acquired sites anticipated to contribute >3.7 EH/s with S21 Pro miners installed.
- Company will operate over 400 MW in Georgia after Sandersville fully energized.
- Sites include interruptible PPAs enabling load balancing for local electric cooperatives.

## SEC filing metadata
- accession: 0000950170-24-075754
- form_type: 8-K
- ticker: CLSK
- cik: 0000827876
- company_name: CLEANSPARK, INC.
- filed_at: 2024-06-20T23:59:59+00:00
- event_type: m_and_a
- sentiment: positive
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: high
- sec_items: 1.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/827876/000095017024075754/0000950170-24-075754-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/827876/000095017024075754/clsk-20240617.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000950170-24-075754
- JSON: https://secwatch.observer/filing/0000950170-24-075754.json
- Plain text: https://secwatch.observer/filing/0000950170-24-075754.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
