---
schema_version: "secwatch.filing_event.v1"
accession: "0000950170-24-088986"
form_type: "8-K"
ticker: "CLSK"
cik: "0000827876"
company_name: "CLEANSPARK, INC."
filed_at: "2024-08-01T23:59:59+00:00"
generated_at: "2026-05-31T14:08:14.953429+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# CleanSpark acquires 30 MW Wyoming Bitcoin mining site, signs 75 MW power contracts

## Summary
- Acquired a 30 MW immersion-cooled site in Cheyenne, adding over 2 EH/s to hashrate by end of 2024.
- Executed an additional 45 MW power contract for a second Wyoming site, expected to add 3 EH/s.
- Will deploy all-new S21 immersion XP miners at the Cheyenne facility.
- Portfolio expands to 12 sites in Georgia, 3 in Mississippi, 1 in Wyoming, plus TN and NY co-locations.
- Pending GRIID Infrastructure acquisition to further boost Tennessee hashrate.

## SEC filing metadata
- accession: 0000950170-24-088986
- form_type: 8-K
- ticker: CLSK
- cik: 0000827876
- company_name: CLEANSPARK, INC.
- filed_at: 2024-08-01T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/827876/000095017024088986/0000950170-24-088986-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/827876/000095017024088986/clsk-20240726.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000950170-24-088986
- JSON: https://secwatch.observer/filing/0000950170-24-088986.json
- Plain text: https://secwatch.observer/filing/0000950170-24-088986.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
