{"schema_version":"secwatch.filing_event.v1","accession":"0000950170-24-095751","form_type":"8-K","ticker":"CIFR","cik":"0001819989","company_name":"Cipher Digital Inc.","filed_at":"2024-08-13T23:59:59+00:00","discovered_at":"2026-05-14T18:03:14.661627+00:00","generated_at":"2026-05-31T09:47:36.082508+00:00","sec_items":["2.02","7.01","9.01"],"event_type":"earnings","sentiment":"neutral","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Cipher Mining Q2 GAAP net loss $15M; adding 1.7 GW power, targets 35 EH/s by 2025","bullets":["Q2 2024 GAAP net loss $15M ($0.05 diluted share); non-GAAP adjusted loss $3M ($0.01/share).","Current self-mining hashrate ~8.7 EH/s; targeting ~13.5 EH/s by Q4 2024 and ~35.0 EH/s by end-2025.","Acquiring 1.7 GW power capacity: Reveille site (up to 200 MW) closing soon; term for option on 1.5 GW sites.","Construction of 300 MW Black Pearl data center underway; energization expected Q2 2025.","Odessa site upgrade on track for Q4 2024 to reach ~13.5 EH/s."],"urls":{"canonical":"https://secwatch.observer/filing/0000950170-24-095751","json":"https://secwatch.observer/filing/0000950170-24-095751.json","markdown":"https://secwatch.observer/filing/0000950170-24-095751.md","text":"https://secwatch.observer/filing/0000950170-24-095751.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1819989/000095017024095751/0000950170-24-095751-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1819989/000095017024095751/cifr-20240813.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-31T09:47:36.082508+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}