---
schema_version: "secwatch.filing_event.v1"
accession: "0000950170-24-107034"
form_type: "8-K"
ticker: "CLSK"
cik: "0000827876"
company_name: "CLEANSPARK, INC."
filed_at: "2024-09-17T23:59:59+00:00"
generated_at: "2026-05-31T04:24:59.012141+00:00"
event_type: "m_and_a"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# CleanSpark acquires 16.5 MW Mississippi sites for $5.775M, closes 45 MW Wyoming site

## Summary
- Total purchase price of Mississippi sites is up to $5.775M; includes land and construction completion, expected turnkey by Dec 1, 2024.
- Mississippi sites will house S21 pro miners, expected combined hashrate of ~1 EH/s; expands Mississippi portfolio to 60.5 MW.
- Wyoming 45 MW site closed on Sept 11, 2024, immersion-cooled, expected to add ~3 EH/s with latest S21 immersion XPs.
- CEO Zach Bradford: total operational capacity now 211.5 MW (+38% in 7 days), supporting 37 EH/s by end of 2024 and 50 EH/s in 2025.

## SEC filing metadata
- accession: 0000950170-24-107034
- form_type: 8-K
- ticker: CLSK
- cik: 0000827876
- company_name: CLEANSPARK, INC.
- filed_at: 2024-09-17T23:59:59+00:00
- event_type: m_and_a
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 1.01, 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/827876/000095017024107034/0000950170-24-107034-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/827876/000095017024107034/clsk-20240916.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000950170-24-107034
- JSON: https://secwatch.observer/filing/0000950170-24-107034.json
- Plain text: https://secwatch.observer/filing/0000950170-24-107034.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
