---
schema_version: "secwatch.filing_event.v1"
accession: "0000950170-24-110388"
form_type: "8-K"
ticker: "CLSK"
cik: "0000827876"
company_name: "CLEANSPARK, INC."
filed_at: "2024-09-30T23:59:59+00:00"
generated_at: "2026-05-31T01:00:43.387693+00:00"
event_type: "other"
sentiment: "neutral"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# CleanSpark shuts 365 MW as Hurricane Helene hits; 200 MW restored, full ops expected Oct 4

## Summary
- All employees safe; no material damage to infrastructure or mining servers confirmed.
- Precautionary shutdown of 365 MW capacity in Southeast Georgia; 200 MW back online within 24 hours.
- Remaining 165 MW expected to be restored by October 4, 2024, coordinated with local utilities.
- Current hashrate approximately 22 EH/s; full return to ~28 EH/s after all sites re-energized.
- Portfolio diversity allowed ~10.5 EH/s to continue at other sites during the storm.

## SEC filing metadata
- accession: 0000950170-24-110388
- form_type: 8-K
- ticker: CLSK
- cik: 0000827876
- company_name: CLEANSPARK, INC.
- filed_at: 2024-09-30T23:59:59+00:00
- event_type: other
- sentiment: neutral
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 7.01, 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/827876/000095017024110388/0000950170-24-110388-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/827876/000095017024110388/clsk-20240930.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000950170-24-110388
- JSON: https://secwatch.observer/filing/0000950170-24-110388.json
- Plain text: https://secwatch.observer/filing/0000950170-24-110388.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
