{"schema_version":"secwatch.filing_event.v1","accession":"0000950170-25-046410","form_type":"8-K","ticker":"LAC","cik":"0001966983","company_name":"LITHIUM AMERICAS CORP.","filed_at":"2025-03-28T23:59:59+00:00","discovered_at":"2026-05-14T18:03:05.676050+00:00","generated_at":"2026-05-24T03:25:35.986854+00:00","sec_items":["2.02","7.01","9.01"],"event_type":"earnings","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Lithium Americas reports FY2024 net loss of $42.6M; Thacker Pass construction on track for late 2027","bullets":["Net loss of $42.6M ($0.21 per share) vs $5.1M in 2023; operating expenses $28.3M.","Cash & equivalents $594.2M, up from $195.8M; total assets $1,044.9M.","Thacker Pass Phase 1 engineering >55% complete; first concrete targeted May 2025, production late 2027.","Funding secured: $2.26B DOE loan, $625M GM JV, $250M Orion; fully funded for Phase 1 construction.","Capitalized $179.9M in construction costs; 14.3 Mt LCE reserve supports 85-year mine life."],"urls":{"canonical":"https://secwatch.observer/filing/0000950170-25-046410","json":"https://secwatch.observer/filing/0000950170-25-046410.json","markdown":"https://secwatch.observer/filing/0000950170-25-046410.md","text":"https://secwatch.observer/filing/0000950170-25-046410.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1966983/000095017025046410/0000950170-25-046410-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1966983/000095017025046410/lac-20250328.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-24T03:25:35.986854+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}