---
schema_version: "secwatch.filing_event.v1"
accession: "0000950170-25-074899"
form_type: "8-K/A"
ticker: "DYNR"
cik: "0001111741"
company_name: "DYNARESOURCE, INC."
filed_at: "2025-05-20T23:59:59+00:00"
generated_at: "2026-05-20T23:35:06.222076+00:00"
event_type: "regulatory"
sentiment: "neutral"
materiality_score: 0.45
calibrated_materiality_score: 0.45
confidence: "high"
source: SEC EDGAR
---

# DynaResource files initial technical report summary for San José de Gracia Gold Project

## Summary
- Technical Report Summary filed under S-K 1300 for San José de Gracia Project, Sinaloa State, Mexico.
- TRS dated March 24, 2025, included as Exhibit 99.1 to the 8-K/A.
- Consents of P&E Mining Consultants Inc. and D.E.N.M Engineering Ltd. also filed as Exhibits 23.1 and 23.2.

## SEC filing metadata
- accession: 0000950170-25-074899
- form_type: 8-K/A
- ticker: DYNR
- cik: 0001111741
- company_name: DYNARESOURCE, INC.
- filed_at: 2025-05-20T23:59:59+00:00
- event_type: regulatory
- sentiment: neutral
- materiality_score: 0.45
- calibrated_materiality_score: 0.45
- confidence: high
- sec_items: 9.01, 8.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1111741/000095017025074899/0000950170-25-074899-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1111741/000095017025074899/dynr-20250519.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0000950170-25-074899
- JSON: https://secwatch.observer/filing/0000950170-25-074899.json
- Plain text: https://secwatch.observer/filing/0000950170-25-074899.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
