---
schema_version: "secwatch.filing_event.v1"
accession: "0001057877-21-000127"
form_type: "8-K"
ticker: "IDA"
cik: "0001057877"
company_name: "IDACORP INC"
filed_at: "2021-12-30T23:59:59+00:00"
generated_at: "2026-06-27T21:36:10.722509+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.4
calibrated_materiality_score: 0.4
confidence: "low"
source: SEC EDGAR
---

# IDACORP issues investor presentation with 2021 IRP updates on load, coal retirements, transmission

## Summary
- Presentation includes load forecasts, coal unit retirement timelines, and transmission projects from Idaho Power's 2021 Integrated Resource Plan.
- IRP filed with Idaho Public Utilities Commission on December 30, 2021.
- Materials used in meetings with analysts and investors in January and February 2022; available on www.idacorpinc.com.
- No specific financial numbers or guidance changes disclosed in the filing.

## SEC filing metadata
- accession: 0001057877-21-000127
- form_type: 8-K
- ticker: IDA
- cik: 0001057877
- company_name: IDACORP INC
- filed_at: 2021-12-30T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.4
- calibrated_materiality_score: 0.4
- confidence: low
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1057877/000105787721000127/0001057877-21-000127-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/49648/000105787721000127/ida-20211230.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001057877-21-000127
- JSON: https://secwatch.observer/filing/0001057877-21-000127.json
- Plain text: https://secwatch.observer/filing/0001057877-21-000127.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
