{"schema_version":"secwatch.filing_event.v1","accession":"0001062993-24-016319","form_type":"8-K","ticker":"ANY","cik":"0001591956","company_name":"Sphere 3D Corp.","filed_at":"2024-09-10T23:59:59+00:00","discovered_at":"2026-05-14T18:03:13.688685+00:00","generated_at":"2026-05-31T05:39:09.677822+00:00","sec_items":["7.01","9.01"],"event_type":"m_and_a","sentiment":"positive","materiality_score":0.6,"calibrated_materiality_score":0.6,"confidence":"high","headline":"Sphere 3D signs LOI to acquire 12.5 MW bitcoin mining site in Iowa with sub-4c power; target operational by Dec 2024","bullets":["12.5 MW site in Iowa with average power cost below 4 cents per kWh.","Facility expected to be operational by early December 2024.","3-year managed services agreement with Simple Mining to operate the site.","Acquisition funded with existing working capital; company remains debt-free.","CEO cites reduced hosting exposure and improved marginal cost to mine."],"urls":{"canonical":"https://secwatch.observer/filing/0001062993-24-016319","json":"https://secwatch.observer/filing/0001062993-24-016319.json","markdown":"https://secwatch.observer/filing/0001062993-24-016319.md","text":"https://secwatch.observer/filing/0001062993-24-016319.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1591956/000106299324016319/0001062993-24-016319-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1591956/000106299324016319/form8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-31T05:39:09.677822+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}