---
schema_version: "secwatch.filing_event.v1"
accession: "0001062993-25-003260"
form_type: "8-K"
ticker: "IAUX"
cik: "0001853962"
company_name: "i-80 Gold Corp."
filed_at: "2025-02-24T23:59:59+00:00"
generated_at: "2026-05-26T06:25:31.918944+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "medium"
source: SEC EDGAR
---

# i-80 Gold reports Cove PEA with $271M NPV, 30% IRR; also files Archimedes, Mineral Point PEAs

## Summary
- Cove Project PEA: after-tax NPV(5%) $271M, IRR 30% at $2,175/oz gold; 8-yr life, ~100K oz/yr avg gold production.
- Indicated resource 311K oz Au at 8.2 g/t; inferred 1.16M oz at 8.9 g/t; feasibility study targeted Q4 2025.
- Construction capital $157M (60% dewatering); LOM cash cost $1,194/oz, AISC $1,303/oz.
- Archimedes Underground PEA released Feb 18 and Mineral Point Open Pit PEA released Feb 21; details in exhibits 99.2 and 99.3.
- Cove PEA corrected to confirm designated press release status for prospectus supplement.

## SEC filing metadata
- accession: 0001062993-25-003260
- form_type: 8-K
- ticker: IAUX
- cik: 0001853962
- company_name: i-80 Gold Corp.
- filed_at: 2025-02-24T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: medium
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1853962/000106299325003260/0001062993-25-003260-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1853962/000106299325003260/form8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001062993-25-003260
- JSON: https://secwatch.observer/filing/0001062993-25-003260.json
- Plain text: https://secwatch.observer/filing/0001062993-25-003260.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
