Energy Fuels' Bullfrog Project shows $18.7M after-tax NPV at $90/lb U3O8
ENERGY FUELS INC
- Indicated resources: 1.74 Mton at 0.303% eU3O8 (10.5 Mlb); Inferred: 0.61 Mton at 0.279% (3.4 Mlb).
- Economic analysis (Indicated only): after-tax NPV(8%) $18.7M, IRR 12.4%, payback 5.7 years.
- With Inferred: after-tax NPV(8%) $31.2M, IRR 14%; pre-production 4 yrs, mine life 12-15 yrs.
- Initial capex $55M, sustaining $38M, avg operating cost $307.63/ton; no royalties except 2.6% severance tax.