{"schema_version":"secwatch.filing_event.v1","accession":"0001062993-25-013712","form_type":"8-K","ticker":"LCGMF","cik":"0001339688","company_name":"LION COPPER & GOLD CORP.","filed_at":"2025-08-06T23:59:59+00:00","discovered_at":"2026-05-14T18:02:43.774329+00:00","generated_at":"2026-05-17T18:59:57.359959+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.85,"calibrated_materiality_score":0.85,"confidence":"high","headline":"Lion Copper and Gold PFS for Yerington Project shows $694M post-tax NPV, 14.6% IRR","bullets":["Post-tax NPV(7%) of $694M, IRR 14.6%, payback 6.7 years at $4.30/lb copper base case.","First Mineral Reserve: 506.5M tons at 0.21% CuT containing 2.14B lbs copper.","Average annual production of 120M lbs copper cathode over 12-year mine life; peak 151M lbs in years 5-7.","Initial capital of $724M; cash cost (C1) $1.92/lb, AISC $2.67/lb.","Project utilizing Nuton bioleaching technology; expected 2.5-year permitting timeline with Fast-41 eligibility."],"urls":{"canonical":"https://secwatch.observer/filing/0001062993-25-013712","json":"https://secwatch.observer/filing/0001062993-25-013712.json","markdown":"https://secwatch.observer/filing/0001062993-25-013712.md","text":"https://secwatch.observer/filing/0001062993-25-013712.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1339688/000106299325013712/0001062993-25-013712-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1339688/000106299325013712/form8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-17T18:59:57.359959+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}