other_material
confidence high
sentiment neutral
materiality 0.65
Energy Fuels publishes feasibility study for Vara Mada (Toliara) Project with 904 Mt mineral reserve
ENERGY FUELS INC
- Proven & Probable reserves: 904 Mt at 6.1% total heavy minerals (THM) including ilmenite, rutile, zircon, monazite.
- Life of mine 38 years; Stage 1 production of 12.6 Mtpa ore, Stage 2 expands to 25.0 Mtpa.
- Total LOM production: 36.1 Mt ilmenite, 2.5 Mt zircon, 0.9 Mt monazite, 284 kt rutile.
- Monazite product (up to 29 ktpa in Stage 2) planned for processing at Energy Fuels' White Mesa Mill.
- Permit PE 37242 does not yet include monazite; Base Toliara intends to add it under Malagasy law.
item 8.01item 9.01