{"schema_version":"secwatch.filing_event.v1","accession":"0001062993-26-001052","form_type":"8-K","ticker":"LCGMF","cik":"0001339688","company_name":"LION COPPER & GOLD CORP.","filed_at":"2026-02-18T23:59:59+00:00","discovered_at":"2026-05-14T18:02:34.882472+00:00","generated_at":"2026-05-16T01:58:33.003149+00:00","sec_items":["8.01","9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"medium","headline":"Lion Copper and Gold completes S-K 1300 Preliminary Feasibility Study for Yerington Copper Project","bullets":["Preliminary Feasibility Study effective May 31, 2025 for wholly-owned Yerington Copper Project in Lyon County, Nevada.","Study prepared per S-K 1300 SEC regulations; technical report summary attached to filing.","Consents from Samuel Engineering, AGP Mining, NewFields, T. Maunula, Independent Mining Consultants, and GSI Environmental included.","No specific economic results from the study are disclosed in the filing."],"urls":{"canonical":"https://secwatch.observer/filing/0001062993-26-001052","json":"https://secwatch.observer/filing/0001062993-26-001052.json","markdown":"https://secwatch.observer/filing/0001062993-26-001052.md","text":"https://secwatch.observer/filing/0001062993-26-001052.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1339688/000106299326001052/0001062993-26-001052-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1339688/000106299326001052/form8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-16T01:58:33.003149+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}