---
schema_version: "secwatch.filing_event.v1"
accession: "0001062993-26-001052"
form_type: "8-K"
ticker: "LCGMF"
cik: "0001339688"
company_name: "LION COPPER & GOLD CORP."
filed_at: "2026-02-18T23:59:59+00:00"
generated_at: "2026-05-16T01:58:33.003149+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.7
calibrated_materiality_score: 0.7
confidence: "medium"
source: SEC EDGAR
---

# Lion Copper and Gold completes S-K 1300 Preliminary Feasibility Study for Yerington Copper Project

## Summary
- Preliminary Feasibility Study effective May 31, 2025 for wholly-owned Yerington Copper Project in Lyon County, Nevada.
- Study prepared per S-K 1300 SEC regulations; technical report summary attached to filing.
- Consents from Samuel Engineering, AGP Mining, NewFields, T. Maunula, Independent Mining Consultants, and GSI Environmental included.
- No specific economic results from the study are disclosed in the filing.

## SEC filing metadata
- accession: 0001062993-26-001052
- form_type: 8-K
- ticker: LCGMF
- cik: 0001339688
- company_name: LION COPPER & GOLD CORP.
- filed_at: 2026-02-18T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.7
- calibrated_materiality_score: 0.7
- confidence: medium
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1339688/000106299326001052/0001062993-26-001052-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1339688/000106299326001052/form8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001062993-26-001052
- JSON: https://secwatch.observer/filing/0001062993-26-001052.json
- Plain text: https://secwatch.observer/filing/0001062993-26-001052.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
