{"schema_version":"secwatch.filing_event.v1","accession":"0001062993-26-002783","form_type":"8-K","ticker":"HIVE","cik":"0001720424","company_name":"HIVE Digital Technologies Ltd.","filed_at":"2026-05-19T00:01:20+00:00","discovered_at":"2026-05-19T10:05:00.229338+00:00","generated_at":"2026-05-19T10:05:31.626025+00:00","sec_items":["8.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.85,"calibrated_materiality_score":0.85,"confidence":"high","headline":"HIVE subsidiary BUZZ HPC acquires 25 acres near Toronto for $58M, plans 320 MW AI gigafactory","bullets":["Acquired 21-acre main parcel ($46M) and adjacent ~4-acre parcel ($12M) with 320 MW power allocation in GTA.","Planned AI gigafactory targets second half 2027 online; capital investment ~CAD $3.5B.","At full build-out will host over 100,000 GPUs and create 800+ construction jobs plus hundreds of permanent roles.","HIVE now has over 850 MW of power globally (450 MW operating + 400 MW pipeline for 2027).","BUZZ already has 5,500 GPUs online doing AI compute plus 70 MW New Brunswick site."],"urls":{"canonical":"https://secwatch.observer/filing/0001062993-26-002783","json":"https://secwatch.observer/filing/0001062993-26-002783.json","markdown":"https://secwatch.observer/filing/0001062993-26-002783.md","text":"https://secwatch.observer/filing/0001062993-26-002783.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1720424/000106299326002783/0001062993-26-002783-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1720424/000106299326002783/form8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-19T10:05:31.626025+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}