{"schema_version":"secwatch.filing_event.v1","accession":"0001083301-24-000138","form_type":"8-K","ticker":"WULF","cik":"0001083301","company_name":"TERAWULF INC.","filed_at":"2024-11-04T23:59:59+00:00","discovered_at":"2026-05-14T18:03:07.607610+00:00","generated_at":"2026-05-30T05:47:12.872543+00:00","sec_items":["7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.65,"calibrated_materiality_score":0.65,"confidence":"high","headline":"TeraWulf mined 150 bitcoin in Oct; HPC hosting capacity target 72.5 MW by Q2 2025","bullets":["Self-mined 150 bitcoin in Oct (avg 4.8/day); power cost $36,789/bitcoin.","8.1 EH/s operational self-mining capacity, up 62% YoY; avg hash rate 6.8 EH/s due to upgrades.","Sold 25% equity in Nautilus Cryptomine facility effective Oct 2, 2024.","Targeting 72.5 MW HPC hosting capacity by end of Q2 2025; CB-1 (20 MW) on track for Q1.","Replacing older miners with ~12,200 S19 XP units; recovery plan for 1.5 EH by year-end."],"urls":{"canonical":"https://secwatch.observer/filing/0001083301-24-000138","json":"https://secwatch.observer/filing/0001083301-24-000138.json","markdown":"https://secwatch.observer/filing/0001083301-24-000138.md","text":"https://secwatch.observer/filing/0001083301-24-000138.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1083301/000108330124000138/0001083301-24-000138-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1083301/000108330124000138/wulf-20241104.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-30T05:47:12.872543+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}