---
schema_version: "secwatch.filing_event.v1"
accession: "0001083301-24-000138"
form_type: "8-K"
ticker: "WULF"
cik: "0001083301"
company_name: "TERAWULF INC."
filed_at: "2024-11-04T23:59:59+00:00"
generated_at: "2026-05-30T05:47:12.872543+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.65
calibrated_materiality_score: 0.65
confidence: "high"
source: SEC EDGAR
---

# TeraWulf mined 150 bitcoin in Oct; HPC hosting capacity target 72.5 MW by Q2 2025

## Summary
- Self-mined 150 bitcoin in Oct (avg 4.8/day); power cost $36,789/bitcoin.
- 8.1 EH/s operational self-mining capacity, up 62% YoY; avg hash rate 6.8 EH/s due to upgrades.
- Sold 25% equity in Nautilus Cryptomine facility effective Oct 2, 2024.
- Targeting 72.5 MW HPC hosting capacity by end of Q2 2025; CB-1 (20 MW) on track for Q1.
- Replacing older miners with ~12,200 S19 XP units; recovery plan for 1.5 EH by year-end.

## SEC filing metadata
- accession: 0001083301-24-000138
- form_type: 8-K
- ticker: WULF
- cik: 0001083301
- company_name: TERAWULF INC.
- filed_at: 2024-11-04T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.65
- calibrated_materiality_score: 0.65
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1083301/000108330124000138/0001083301-24-000138-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1083301/000108330124000138/wulf-20241104.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001083301-24-000138
- JSON: https://secwatch.observer/filing/0001083301-24-000138.json
- Plain text: https://secwatch.observer/filing/0001083301-24-000138.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
