---
schema_version: "secwatch.filing_event.v1"
accession: "0001083301-26-000023"
form_type: "8-K"
ticker: "WULF"
cik: "0001083301"
company_name: "TERAWULF INC."
filed_at: "2026-02-02T23:59:59+00:00"
generated_at: "2026-05-16T05:32:43.126067+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.75
calibrated_materiality_score: 0.75
confidence: "high"
source: SEC EDGAR
---

# TeraWulf acquires two sites adding 1.5 GW capacity, Kentucky and Maryland

## Summary
- Hawesville, KY site closed Feb 2: ~480 MW available power, 250 buildable acres, option exercised.
- Morgantown, MD (PJM) acquisition signed, ~210 MW operational, expandable to 1 GW; closing subject to FERC.
- Portfolio totals 2.8 GW across five sites; targets 250–500 MW new contracted capacity annually.
- Morgantown acquisition includes 210 MW generating station; development to add generation and storage.

## SEC filing metadata
- accession: 0001083301-26-000023
- form_type: 8-K
- ticker: WULF
- cik: 0001083301
- company_name: TERAWULF INC.
- filed_at: 2026-02-02T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.75
- calibrated_materiality_score: 0.75
- confidence: high
- sec_items: 8.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1083301/000108330126000023/0001083301-26-000023-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1083301/000108330126000023/wulf-20260202.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001083301-26-000023
- JSON: https://secwatch.observer/filing/0001083301-26-000023.json
- Plain text: https://secwatch.observer/filing/0001083301-26-000023.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
