---
schema_version: "secwatch.filing_event.v1"
accession: "0001096906-25-001096"
form_type: "8-K"
ticker: "BSAI"
cik: "0001416090"
company_name: "BLUSKY AI INC."
filed_at: "2025-07-07T23:59:59+00:00"
generated_at: "2026-05-18T09:16:02.012147+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.65
calibrated_materiality_score: 0.65
confidence: "high"
source: SEC EDGAR
---

# BluSky AI secures 9.3 MW solar power and 51.6-acre land lease for Utah data center

## Summary
- Acquired exclusive right to 9.3 MW solar/grid power at $0.068/kWh for data center project in Milford, Utah.
- Issued 20 million restricted common shares to Digital Asset Management, LLC as consideration for the power commitment.
- Leased 51.6 acres in Milford, Utah from Wild Mustang Ventures LLC for two years at $90,000 annual base rent.
- Tenant has option to purchase the land; lease auto-extends if option not exercised 30 days before expiration.
- Power cost subject to change with Seller's cost; Buyer pays power company directly; liability remains with Seller.

## SEC filing metadata
- accession: 0001096906-25-001096
- form_type: 8-K
- ticker: BSAI
- cik: 0001416090
- company_name: BLUSKY AI INC.
- filed_at: 2025-07-07T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.65
- calibrated_materiality_score: 0.65
- confidence: high
- sec_items: 1.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1416090/000109690625001096/0001096906-25-001096-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1416090/000109690625001096/imii-20250626.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001096906-25-001096
- JSON: https://secwatch.observer/filing/0001096906-25-001096.json
- Plain text: https://secwatch.observer/filing/0001096906-25-001096.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
