{"schema_version":"secwatch.filing_event.v1","accession":"0001104659-23-114271","form_type":"8-K/A","ticker":"MUX","cik":"0000314203","company_name":"McEwen Inc.","filed_at":"2023-11-03T23:59:59+00:00","discovered_at":"2026-05-14T18:03:31.616424+00:00","generated_at":"2026-06-08T22:48:42.162370+00:00","sec_items":["9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.3,"calibrated_materiality_score":0.3,"confidence":"low","headline":"McEwen Mining amends 8-K to file revised tech report for Los Azules project; no specifics disclosed","bullets":["Amendment filed solely to include revised Exhibit 96.1 (Technical Report Summary for Los Azules Copper Project) as amended Nov 1, 2023.","Consents from Stantec, Samuel Engineering, Knight Piesold, SRK Consulting, and W. David Tyler also filed.","No other changes from original 8-K filed Oct 6, 2023.","Technical report details (resource estimates, economics) not reproduced in this filing text."],"urls":{"canonical":"https://secwatch.observer/filing/0001104659-23-114271","json":"https://secwatch.observer/filing/0001104659-23-114271.json","markdown":"https://secwatch.observer/filing/0001104659-23-114271.md","text":"https://secwatch.observer/filing/0001104659-23-114271.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/314203/000110465923114271/0001104659-23-114271-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/314203/000110465923114271/tm2329654d1_8ka.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-08T22:48:42.162370+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}