---
schema_version: "secwatch.filing_event.v1"
accession: "0001104659-23-114271"
form_type: "8-K/A"
ticker: "MUX"
cik: "0000314203"
company_name: "McEwen Inc."
filed_at: "2023-11-03T23:59:59+00:00"
generated_at: "2026-06-08T22:48:42.162370+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.3
calibrated_materiality_score: 0.3
confidence: "low"
source: SEC EDGAR
---

# McEwen Mining amends 8-K to file revised tech report for Los Azules project; no specifics disclosed

## Summary
- Amendment filed solely to include revised Exhibit 96.1 (Technical Report Summary for Los Azules Copper Project) as amended Nov 1, 2023.
- Consents from Stantec, Samuel Engineering, Knight Piesold, SRK Consulting, and W. David Tyler also filed.
- No other changes from original 8-K filed Oct 6, 2023.
- Technical report details (resource estimates, economics) not reproduced in this filing text.

## SEC filing metadata
- accession: 0001104659-23-114271
- form_type: 8-K/A
- ticker: MUX
- cik: 0000314203
- company_name: McEwen Inc.
- filed_at: 2023-11-03T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.3
- calibrated_materiality_score: 0.3
- confidence: low
- sec_items: 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/314203/000110465923114271/0001104659-23-114271-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/314203/000110465923114271/tm2329654d1_8ka.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001104659-23-114271
- JSON: https://secwatch.observer/filing/0001104659-23-114271.json
- Plain text: https://secwatch.observer/filing/0001104659-23-114271.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
