{"schema_version":"secwatch.filing_event.v1","accession":"0001104659-24-089609","form_type":"8-K","ticker":"MRAM","cik":"0001438423","company_name":"EVERSPIN TECHNOLOGIES INC.","filed_at":"2024-08-14T23:59:59+00:00","discovered_at":"2026-05-14T18:03:13.070604+00:00","generated_at":"2026-05-31T09:17:38.395910+00:00","sec_items":["1.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.65,"calibrated_materiality_score":0.65,"confidence":"high","headline":"Everspin signs $9.25M joint development deal with Frontgrade for radiation-hardened MRAM","bullets":["Contract with Frontgrade Colorado Springs for SRH high-reliability eMRAM macro for aerospace/defense.","Total potential value up to $9.25M across multiple phases; current phase $1.25M.","Everspin provides PERSYST MRAM tech, logic design, and back-end-of-line manufacturing.","Manufactured via Skywater RH90 CMOS in MN and Everspin's MRAM process in Chandler, AZ.","Term is 5 years with automatic one-year renewals; IP developed is owned by Frontgrade."],"urls":{"canonical":"https://secwatch.observer/filing/0001104659-24-089609","json":"https://secwatch.observer/filing/0001104659-24-089609.json","markdown":"https://secwatch.observer/filing/0001104659-24-089609.md","text":"https://secwatch.observer/filing/0001104659-24-089609.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1438423/000110465924089609/0001104659-24-089609-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1438423/000110465924089609/tm2421699d1_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-31T09:17:38.395910+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}