secwatch.observer — SEC 8-K summary ====================================== Issuer: Ivanhoe Electric Inc. (IE) CIK: 0001879016 Form: 8-K Filed at: 2025-06-23T23:59:59+00:00 Accession: 0001104659-25-061364 Event type: other_material Sentiment: positive Materiality: 0.75 Item codes: 7.01, 8.01, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Ivanhoe Electric releases PFS for Santa Cruz Copper Project with 182.9 Mt indicated resource at 0.81% Cu -------------------------------------------------------------------------------- - PFS replaces prior initial assessment; indicated resource 182.9 Mt at 0.81% Cu (exclusive of reserves) and 326.5 Mt at 0.95% Cu (inclusive). - Inferred resource adds 422.0 Mt at 0.79% Cu across Santa Cruz, East Ridge, and Texaco deposits. - Groundwater inflow reduced ~50% vs. 2023 IA: residual passive inflows ≤6,000 gpm first 10 years vs. prior 12,000 gpm. - Metallurgical tests indicate 92.2% total Cu recovery via heap leach (6-m lift, 180-day irrigation). - Investor call scheduled for June 23, 2025; PFS prepared by independent qualified persons under S-K 1300. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1879016/000110465925061364/0001104659-25-061364-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1879016/000110465925061364/tm2518281d1_8k.htm HTML page: https://secwatch.observer/filing/0001104659-25-061364 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer