{"schema_version":"secwatch.filing_event.v1","accession":"0001104659-25-099359","form_type":"8-K","ticker":"GEVO","cik":"0001392380","company_name":"Gevo, Inc.","filed_at":"2025-10-14T23:59:59+00:00","discovered_at":"2026-05-14T18:02:39.289418+00:00","generated_at":"2026-05-17T03:52:01.728734+00:00","sec_items":["8.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"Gevo receives DOE loan guarantee extension to April 2026; considers shift to smaller ATJ-30 project","bullets":["DOE LPO extends conditional commitment for $1.46B loan guarantee (excl. $167M capitalized interest) until April 16, 2026.","Extension allows evaluation of potential modifications including building lower-cost 30M gal/yr ATJ-30 facility.","ATJ-30 would be located at existing ethanol/CCUS facility in North Dakota, using captured CO2 for enhanced oil recovery.","Previous project (ATJ-60) for Lake Preston, SD; scope may be modified to align with new energy policies."],"urls":{"canonical":"https://secwatch.observer/filing/0001104659-25-099359","json":"https://secwatch.observer/filing/0001104659-25-099359.json","markdown":"https://secwatch.observer/filing/0001104659-25-099359.md","text":"https://secwatch.observer/filing/0001104659-25-099359.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1392380/000110465925099359/0001104659-25-099359-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1392380/000110465925099359/tm2528663d1_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-17T03:52:01.728734+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}