{"schema_version":"secwatch.filing_event.v1","accession":"0001104659-25-104398","form_type":"8-K","ticker":"AGX","cik":"0000100591","company_name":"ARGAN INC","filed_at":"2025-10-30T23:59:59+00:00","discovered_at":"2026-05-14T18:02:38.494043+00:00","generated_at":"2026-05-17T01:11:56.913883+00:00","sec_items":["8.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.75,"calibrated_materiality_score":0.75,"confidence":"high","headline":"Argan subsidiary receives full NTP on $1.35B EPC contract for 1,350 MW Texas plant","bullets":["Gemma Power Systems to build CPV Basin Ranch Energy Center, a 1,350 MW combined-cycle plant in Ward County, TX.","Full notice to proceed received; contract value will be added to Q3 backlog ending October 31, 2025.","Plant features GE 7HA.03 turbines with optional carbon capture; completion expected in 2028.","Construction begins this fall; expected to create thousands of jobs and power 850,000 West Texas homes.","POWER Engineers selected for detailed engineering; CPV is the developer and customer."],"urls":{"canonical":"https://secwatch.observer/filing/0001104659-25-104398","json":"https://secwatch.observer/filing/0001104659-25-104398.json","markdown":"https://secwatch.observer/filing/0001104659-25-104398.md","text":"https://secwatch.observer/filing/0001104659-25-104398.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/100591/000110465925104398/0001104659-25-104398-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/100591/000110465925104398/agx-20251030x8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-17T01:11:56.913883+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}