{"schema_version":"secwatch.filing_event.v1","accession":"0001104659-26-104311","form_type":"8-K","ticker":"MUX","cik":"0000314203","company_name":"McEwen Inc.","filed_at":"2026-09-01T20:14:50+00:00","discovered_at":"2026-09-01T20:16:17.482933+00:00","generated_at":"2026-09-01T20:16:28.602266+00:00","sec_items":["7.01","9.01"],"event_type":"debt","sentiment":"positive","materiality_score":0.65,"calibrated_materiality_score":0.65,"confidence":"high","headline":"McEwen Copper closes $240M term loan to advance Los Azules; FID expected mid-2027","bullets":["$240M senior secured 4-year term loan closed; Sprott $112M, Rob McEwen $85M, others $43M.","Interest at 12% p.a., payable monthly; prepayment fee 5% of remaining principal.","Proceeds to fund engineering and early works at Los Azules, Argentina; FID and full financing expected mid-2027.","Los Azules 2025-26 drilling >5,600m; geotech better than expected; EPCM contractor selection by Q4 2026.","McEwen owns 46.3% of McEwen Copper; royalty projected ~$1.4B undiscounted pre-tax cash flow."],"urls":{"canonical":"https://secwatch.observer/filing/0001104659-26-104311","json":"https://secwatch.observer/filing/0001104659-26-104311.json","markdown":"https://secwatch.observer/filing/0001104659-26-104311.md","text":"https://secwatch.observer/filing/0001104659-26-104311.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/314203/000110465926104311/0001104659-26-104311-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/314203/000110465926104311/tm2624401d1_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-09-01T20:16:28.602266+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}