secwatch.observer — SEC 8-K summary ====================================== Issuer: AMEREN CORP (AEE) CIK: 0001002910 Form: 8-K Filed at: 2026-09-28T21:25:27+00:00 Accession: 0001104659-26-111420 Event type: other_material Sentiment: neutral Materiality: 0.45 Item codes: 8.01 LLM model: deepseek-v4.1-flash:cloud@v2 Ameren Missouri files 2026 IRP with MoPSC; plans 2,100 MW gas by 2031, 1,300 MW solar by 2030 -------------------------------------------------------------------------------- - Forecast load growth of 2.9-3.9 GW by 2030, 5-6 GW by 2035 and 6-9 GW by 2045 underpins the preferred plan filed Sept. 28, 2026 with the Missouri PSC. - Adds 2,100 MW of combined-cycle natural gas by 2031, plus 2,800 MW by 2035 and 1,400 MW by 2042, and 1,900 MW of simple-cycle gas by 2029. - Adds 1,300 MW of solar by 2030 (+1,050 MW by 2035), 1,500 MW of wind by 2040, 2,400 MW of battery storage by 2030 and 500 MW of gas fuel cells by 2030. - Includes 1,200 MW of new nuclear by 2040; Ameren Missouri expects to seek and receive NRC approval to extend Callaway's operating license beyond its 2044 expiration. - Labadie coal units' retirement pushed to 2042 from 2036; about 1,800 MW of natural gas-fired capacity to be retired by 2040. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1002910/000110465926111420/0001104659-26-111420-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/100826/000110465926111420/tm2626189d1_8k.htm HTML page: https://secwatch.observer/filing/0001104659-26-111420 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer