other material
confidence high
sentiment positive
materiality 0.72
Ivanhoe Electric hits 123.6m at 0.91% copper, 0.44 g/t gold in first Gleeson drill results
Ivanhoe Electric Inc.
- Hole CGD26-TR-003: 123.60m at 0.91% Cu, 0.44 g/t Au, 5.27 g/t Ag from 601.70m, including 71.03m at 1.38% Cu, 0.52 g/t Au, 6.73 g/t Ag.
- Hole CGD26-TR-008, ~250m southwest: 381.66m at 0.34% Cu, 0.29 g/t Au, 1.07 g/t Ag from 587.85m, including 41.51m at 0.38% Cu and 1.23 g/t Au.
- Two domains found: upper copper-gold-silver breccia from 600m depth across ~500x500m and open; deeper intrusive/carbonate-replacement zone below 1,000m over 800m N-S, 600m E-W.
- Assays pending for four of 11 holes including CGD26-TR-009 and -010; results expected before end of 2026; program to reach 16,000m total by year-end.
- Gleeson named the company's highest priority project; IE controls 19,606 acres of mineral rights and 2,033 acres of private surface 28 miles north of Bisbee, Arizona.