secwatch.observer — SEC 8-K summary ====================================== Issuer: FTAI Infrastructure Inc. (FIP) CIK: 0001899883 Form: 8-K Filed at: 2023-01-24T23:59:59+00:00 Accession: 0001140361-23-002576 Event type: other_material Sentiment: negative Materiality: 0.65 Item codes: 2.02, 9.01 LLM model: deepseek-v4-flash:cloud@v2 Long Ridge energy terminal returns to full operations but expects Q4 2022 operating loss -------------------------------------------------------------------------------- - 50.1%-owned Long Ridge power plant returned to full operational status at end of Q4 2022 after extended outage for gas turbine repair. - Turbine damage discovered during planned maintenance; caused by construction debris left in air intake prior to commissioning. - Long Ridge expects to report an operating loss for Q4 2022 due to revenue interruption from the outage. - All repair costs expected to be covered under warranty; management views it as one-time event. - CEO says outage won't affect long-term revenue and profitability; sees upside in incremental gas production and developments. Source: EDGAR index: https://www.sec.gov/Archives/edgar/data/1899883/000114036123002576/0001140361-23-002576-index.htm Primary doc: https://www.sec.gov/Archives/edgar/data/1899883/000114036123002576/brhc10046975_8k.htm HTML page: https://secwatch.observer/filing/0001140361-23-002576 License: Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer