{"schema_version":"secwatch.filing_event.v1","accession":"0001140361-23-009902","form_type":"8-K","ticker":"QBTS","cik":"0001907982","company_name":"D-Wave Quantum Inc.","filed_at":"2023-03-03T23:59:59+00:00","discovered_at":"2026-05-14T18:03:47.429529+00:00","generated_at":"2026-06-18T13:40:20.076078+00:00","sec_items":["1.01","9.01"],"event_type":"other_material","sentiment":"neutral","materiality_score":0.5,"calibrated_materiality_score":0.5,"confidence":"medium","headline":"D-Wave amends wafer supply agreement with SkyWater; pricing and commitments revised","bullets":["Thirteenth Amendment to Semiconductor Line Operation Agreement with SkyWater Technology Foundry, effective Dec 15, 2022.","Amendment revises Activity Billing rates, quarterly commitments, and hot lot pricing (specific figures redacted).","Agreement covers purchase of available capacity on Cypress 8-inch wafer semiconductor line for D-Wave's quantum processors.","Amendment executed March 1, 2023; prior amendment dated April 30, 2020."],"urls":{"canonical":"https://secwatch.observer/filing/0001140361-23-009902","json":"https://secwatch.observer/filing/0001140361-23-009902.json","markdown":"https://secwatch.observer/filing/0001140361-23-009902.md","text":"https://secwatch.observer/filing/0001140361-23-009902.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1907982/000114036123009902/0001140361-23-009902-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1907982/000114036123009902/ny20007899x1_8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-18T13:40:20.076078+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"3cbe13c91b94ed9a108867139a5af418180c0cf5","claim":"D-Wave Quantum Inc. amended Agreement for Semiconductor Line Operation with SkyWater Technology Foundry, Inc. valued at The Amendment revised the pricing and quarterly commitments set forth under the Agreement. (effective 2023-03-01).","evidence_excerpt":"On March 1, 2023, D-Wave Systems Inc., an indirectly, wholly-owned subsidiary of D-Wave Quantum Inc., entered into an amendment (the “Amendment”) to the Agreement for Semiconductor Line Operation, dated as of December 23, 2012, by and between Cypress Semiconductor Corporation and D-Wave Systems Inc., as amended and assigned to SkyWater Technology Foundry, Inc. (the “Agreement”).","evidence_source":"SEC 8-K Item 1.01/1.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1907982/000114036123009902/0001140361-23-009902-index.htm","confidence":0.95,"family_label":"Material Agreements","details":[{"label":"Action","value":"amendment"},{"label":"Agreement","value":"supply"},{"label":"Counterparty","value":"SkyWater Technology Foundry, Inc."},{"label":"Value","value":"The Amendment revised the pricing and quarterly commitments set forth under the Agreement."},{"label":"Effective","value":"2023-03-01"}],"fact_type":"material_agreement"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}