{"schema_version":"secwatch.filing_event.v1","accession":"0001157523-23-000175","form_type":"8-K","ticker":"CTGO","cik":"0001502377","company_name":"Contango Silver & Gold Inc.","filed_at":"2023-02-06T23:59:59+00:00","discovered_at":"2026-05-14T18:03:45.292203+00:00","generated_at":"2026-06-20T00:01:11.044071+00:00","sec_items":["2.02","7.01","9.01"],"event_type":"earnings","sentiment":"negative","materiality_score":0.7,"calibrated_materiality_score":0.7,"confidence":"high","headline":"Contango ORE reports Q2 FY2023 net loss of $14.3M, widening from $4.9M loss YoY","bullets":["Net loss of $14.3M ($2.10 per share) for Q2 FY2023 vs $4.9M loss ($0.72) in prior year.","Six-month loss $21.4M ($3.15 per share) vs $9.4M ($1.41) prior year; driven by Lucky Shot & Peak Gold costs.","Manh Choh project (30% owned) targeting first production H2 2024 at 225,000 GEO/year (CORE's 30% = 67,500 GEO).","Initial resource on Lucky Shot expected by end of March 2023; camp construction complete.","Company expects additional losses until commercial production begins in H2 2024."],"urls":{"canonical":"https://secwatch.observer/filing/0001157523-23-000175","json":"https://secwatch.observer/filing/0001157523-23-000175.json","markdown":"https://secwatch.observer/filing/0001157523-23-000175.md","text":"https://secwatch.observer/filing/0001157523-23-000175.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1502377/000115752323000175/0001157523-23-000175-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1502377/000115752323000175/a53303866.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-06-20T00:01:11.044071+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"da4c1835b50dd815ce8ba0a98667e7c96aa19559","claim":"Contango Silver & Gold Inc. reported three months ended December 31, 2022 results: net income $(14.3) million, EPS $(2.10).","evidence_excerpt":"Contango ORE Announces Earnings For Quarter Ended December 31, 2022 HOUSTON--(BUSINESS WIRE)--February 6, 2023--Contango ORE, Inc. (“CORE” or the “Company”) (NYSE American: CTGO) announced that it had a net loss of $(14.3) million, or $(2.10) per basic and diluted share, for the three months ended December 31, 2022 compared to a net loss of ($4.9) million or $(0.72) per basic and diluted share for the same period last year.","evidence_source":"SEC 8-K Item 2.02","evidence_url":"https://www.sec.gov/Archives/edgar/data/1502377/000115752323000175/0001157523-23-000175-index.htm","confidence":0.9,"family_label":"Earnings Releases","details":[{"label":"Period","value":"three months ended December 31, 2022"},{"label":"Net income","value":"$(14.3) million"},{"label":"EPS","value":"$(2.10)"},{"label":"Result","value":"reported results"}],"fact_type":"earnings_release"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}