{"schema_version":"secwatch.filing_event.v1","accession":"0001171843-24-005651","form_type":"8-K","ticker":"ASPN","cik":"0001145986","company_name":"ASPEN AEROGELS INC","filed_at":"2024-10-16T23:59:59+00:00","discovered_at":"2026-05-14T18:03:07.797307+00:00","generated_at":"2026-05-30T13:36:12.652017+00:00","sec_items":["2.02","7.01","8.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.85,"calibrated_materiality_score":0.85,"confidence":"high","headline":"Aspen Aerogels gets conditional DOE loan up to $670.6M for second plant; Q3 rev $117M","bullets":["DOE conditional commitment for loan of up to $670.6M under Advanced Technology Vehicles Manufacturing program.","Loan would fund remaining CAPEX for Register, GA plant; interest rate = U.S. Treasury Rate at draw.","Register Plant expected to provide $1.2B-$1.6B incremental PyroThin thermal barrier revenue capacity.","Q3 prelim: revenue ~$117M, net loss ~$13M (incl. $27.5M convertible note extinguishment charge), Adj. EBITDA ~$25M.","Cash $113M as of Sep 30, 2024."],"urls":{"canonical":"https://secwatch.observer/filing/0001171843-24-005651","json":"https://secwatch.observer/filing/0001171843-24-005651.json","markdown":"https://secwatch.observer/filing/0001171843-24-005651.md","text":"https://secwatch.observer/filing/0001171843-24-005651.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/1145986/000117184324005651/0001171843-24-005651-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/1145986/000117184324005651/f8k_101624.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-30T13:36:12.652017+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}