---
schema_version: "secwatch.filing_event.v1"
accession: "0001185185-23-001262"
form_type: "8-K"
ticker: "ROYL"
cik: "0001694617"
company_name: "Royale Energy, Inc."
filed_at: "2023-11-29T23:59:59+00:00"
generated_at: "2026-06-07T20:20:21.617403+00:00"
event_type: "other_material"
sentiment: "positive"
materiality_score: 0.55
calibrated_materiality_score: 0.55
confidence: "high"
source: SEC EDGAR
---

# Royale Energy reports initial production of 1,315 and 1,227 BOEPD from two Permian JDA wells

## Summary
- Third well (Oct 2023): 1,093 BOPD & 1,332 MCFD; expected reserves >1.4M BOE.
- Fourth well (Oct 2023): 1,024 BOPD & 1,219 MCFD; expected reserves >1.4M BOE.
- Royale holds 7% working interest in the 6,900-acre JDA with Ares Energy LTD.
- One more well planned in 2023 and four to six wells in 2024 on the project.
- All wells located in Ector County, Texas, Permian Basin Mississippian interval.

## SEC filing metadata
- accession: 0001185185-23-001262
- form_type: 8-K
- ticker: ROYL
- cik: 0001694617
- company_name: Royale Energy, Inc.
- filed_at: 2023-11-29T23:59:59+00:00
- event_type: other_material
- sentiment: positive
- materiality_score: 0.55
- calibrated_materiality_score: 0.55
- confidence: high
- sec_items: 7.01, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1694617/000118518523001262/0001185185-23-001262-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1694617/000118518523001262/royaleinc20231127_8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001185185-23-001262
- JSON: https://secwatch.observer/filing/0001185185-23-001262.json
- Plain text: https://secwatch.observer/filing/0001185185-23-001262.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
