---
schema_version: "secwatch.filing_event.v1"
accession: "0001193125-25-107559"
form_type: "8-K"
ticker: "SEI"
cik: "0001697500"
company_name: "Solaris Energy Infrastructure, Inc."
filed_at: "2025-04-30T23:59:59+00:00"
generated_at: "2026-05-23T02:29:20.174858+00:00"
event_type: "other_material"
sentiment: "neutral"
materiality_score: 0.8
calibrated_materiality_score: 0.8
confidence: "high"
source: SEC EDGAR
---

# Solaris forms AI data center JV, reports preliminary Q1 revenue $126M and EPS $0.14

## Summary
- Formed Stateline JV with CTC; contributed $86.4M assets for 50.1% equity, CTC $86M for 49.9%.
- JV to provide off-grid power for AI data center; represents ~900 MW (53% of Solaris Power Solutions generation).
- Preliminary Q1 2025: revenue $126.3M, net income $13.0M, diluted EPS $0.14, Adjusted EBITDA $46.9M.
- Cash $16.7M, no borrowings on revolver; $49.4M availability as of March 31, 2025.
- Class action lawsuit filed March 28, 2025, alleging misleading statements re MER acquisition; company to defend.

## SEC filing metadata
- accession: 0001193125-25-107559
- form_type: 8-K
- ticker: SEI
- cik: 0001697500
- company_name: Solaris Energy Infrastructure, Inc.
- filed_at: 2025-04-30T23:59:59+00:00
- event_type: other_material
- sentiment: neutral
- materiality_score: 0.8
- calibrated_materiality_score: 0.8
- confidence: high
- sec_items: 1.01, 2.02, 8.01, 2.03, 9.01
- EDGAR index: https://www.sec.gov/Archives/edgar/data/1697500/000119312525107559/0001193125-25-107559-index.htm
- EDGAR primary document: https://www.sec.gov/Archives/edgar/data/1697500/000119312525107559/d939534d8k.htm

## Machine-readable alternates
- HTML: https://secwatch.observer/filing/0001193125-25-107559
- JSON: https://secwatch.observer/filing/0001193125-25-107559.json
- Plain text: https://secwatch.observer/filing/0001193125-25-107559.txt

This AI-assisted summary is a reading aid. Review the linked SEC EDGAR filing before relying on any specific claim.
