{"schema_version":"secwatch.filing_event.v1","accession":"0001193125-25-123665","form_type":"8-K","ticker":"UFI","cik":"0000100726","company_name":"UNIFI INC","filed_at":"2025-05-21T23:59:59+00:00","discovered_at":"2026-05-14T18:02:47.139243+00:00","generated_at":"2026-05-20T22:00:51.778963+00:00","sec_items":["1.01","2.01","7.01","9.01"],"event_type":"other_material","sentiment":"positive","materiality_score":0.8,"calibrated_materiality_score":0.8,"confidence":"high","headline":"Unifi sells Madison facility for $45M, reduces debt by $43.3M, expects >$20M annual cost savings","bullets":["Sale of Madison, NC manufacturing facility closed May 20 for $45M; net proceeds used to reduce debt.","Term loan reduced by $25M to $67M; revolving loan reduced by $18.3M to $5.6M; total debt down ~$43.3M.","Company expects over $20M in annualized operating cost savings after transition and restructuring.","Potential deferred compensation up to $8M (2 yr) or $5M (3 yr) based on energy conditions; extra $5M possible (4 yr)."],"urls":{"canonical":"https://secwatch.observer/filing/0001193125-25-123665","json":"https://secwatch.observer/filing/0001193125-25-123665.json","markdown":"https://secwatch.observer/filing/0001193125-25-123665.md","text":"https://secwatch.observer/filing/0001193125-25-123665.txt","edgar_index":"https://www.sec.gov/Archives/edgar/data/100726/000119312525123665/0001193125-25-123665-index.htm","edgar_primary_document":"https://www.sec.gov/Archives/edgar/data/100726/000119312525123665/d59337d8k.htm"},"model":{"generated_by":"deepseek-v4-flash:cloud@v2","generated_at":"2026-05-20T22:00:51.778963+00:00"},"review":{"review_status":"machine_generated","human_reviewed":false,"corrected":false,"correction_note":null,"correction_timestamp":null,"superseded_by":null,"related_filings":[]},"source_grounded_claims":[{"claim_id":"27622d41526491c370d0f0f1539c56c9d24bf6c2","claim":"UNIFI INC completed a disposition involving Enovum NC-1 Bidco, LLC for $45 million (closed 2025-05-20).","evidence_excerpt":"(the “Closing”) to May 20, 2025, (b) waive the Energy Study Contingency (as defined in the Amended Purchase Agreement), and (c) reduce the purchase price payable at Closing to $45 million, subject to the potential payment of deferred compensation to UMI in the amount of (i) $8.0 million, if certain energy supply conditions are met within two years of Closing, (ii)","evidence_source":"SEC 8-K Item 2.01/5.01","evidence_url":"https://www.sec.gov/Archives/edgar/data/100726/000119312525123665/0001193125-25-123665-index.htm","confidence":0.98,"family_label":"M&A Transactions","details":[{"label":"Action","value":"disposition"},{"label":"Counterparty","value":"Enovum NC-1 Bidco, LLC"},{"label":"Consideration","value":"$45 million"},{"label":"Closing","value":"2025-05-20"}],"fact_type":"ma_transaction"}],"license":"Source filings: public domain (SEC EDGAR). Summaries (headline + bullets): CC-BY-4.0; attribute https://secwatch.observer"}